400-820-6719
Case Study

Case Analysis of Dielectric Loss Test for G11 Cabl

Background:

    On December 11-12, 2017, German company Saba and Hangzhou Mingqi Electric Power Equipment Co., Ltd. jointly conducted on-site investigation of 10kV (Lanpu Line, Xingda Line) cable faults with Wenzhou XXXX Power Supply Company. We believe that the on-site investigation of the cable fault is a classic case and has guiding significance for the team to encounter such faults in the future. Therefore, this article is written to record the specific process.

Solution: